Who we are…

SYMC has been founded in 2020. Since 2020 SYMC proved that they are one of the most important
Superyacht Management and Consultancy Company in Turkey with the projects that they had finished
and the superyacht portfolio that they have managed.
With experience and the expertise that SYMC has more than 25 years as a marine surveyor and
project manager, SYMC can be your solution partner regarding all kind’s classification rules, owner
requirements, and the best quality of your existing yachts or new building activities, retrofit activities,
project consultancy, project management activities and all kind of progress reports and documentation.

NEW CONSTRUCTION

Building a superyacht is a long journey for all the parties included. Building a good yacht requires experience, good engineering, eye for detail, budget and people management skills, but above all a passion for yacht building.At SYMC, we are a group of people who share the excitement of building a good yacht with the boat owner and we combine all of our experience and good engineering with excitement to make owner’s needs and wishes come true.We would like to share with you the scope of our work on our boats in this section, which includes our new building projects carried out by us.

M/Y Mereley 35m

The M/Y Mereley project is being built at Kocaeli, and its construction continues, with all of its operations being controlled by us. Our teammates, who are experts in the works to be done and controlled and managed on the boat, welding process, steel and aluminum workmanship, interior, technical design process, engine room equipment installation, piping, paint preparation and application control, insulation control, applications for electrical and electronic equipment and their commissioning, class and flag relations.

TISG New Construction Project’s

❖ M/Y Nb 596 72m St+Alu
❖ M/Y NB 597 100m St+Alu
❖ M/Y NB 598 72m St+Alu
❖ M/Y NB 603 56m Alu
❖ M/Y NB 604 82m St+Alu
❖ M/Y NB 606 53m St+Alu
❖ M/Y NB 607 53m St+Alu
❖ M/Y NB 608 24m Alu

In these projects, which were built as hulls (installation of some equipment & painted) in Turkey, all the controls between the production and customer delivery of the project are inspected and reported with the necessary equipment by our teammates.

REFIT PROJECTS

M/Y DUKE TOWN – 36,5m

M/Y Duke Town has been fully refitted in 2021 and is still being managed by SYMC.
– Full hull and superstructure painting
– Underwater painting
– New Gen-Set installation
– Replacement of new AMS
– Overhaul of main engine system
– Renewal of Interior; Mastercabin, Main saloon, Galley, Laundary
– 5 Years special survey preparation of Flag & Class Society requirements
– Replacement of new Entertainment system

M/Y 4 YOU – 47m

M/Y 4You has been fully refitted in 2020.
– Hull painted with Awl-Grip
– Underwater painting
– Overhaul of Gen-Set
– Replacement of new AMS
– Overhaul of main engine system
– Renewal of Interior; Mastercabin, Main saloon, Galley, Laund
– 5 Years special survey preparation of Flag & Class Society requirements
– Replacement of new Entertainment system

M/Y SECRET 47m

M/Y Secret has been fully refitted in 2021.
– Full hull and superstructure painting
– Underwater painting
– New Gen-Set installation and piping renewed with new system
– Overhaul of main engine system
– Overhaul of full pumps
– Replacement of new Insulations – E/R
– Exterior Design fully upgrade with new furniture and entertaintment system
– 5 Years special survey preparation of Flag & Class Society requirements

M/Y MYSTERE AB

M/Y Mystere AB has been fully refitted in 2022.
– Hull & Superstructure painted with fully
– Underwater painting
– Re-design and built Lazzarette area due to the fire accident
– Overhaul of Gen-Set
– Overhaul of Main Engine system
– Renewal of aft section and connections

M/Y ILERIA -50 M

M/Y Ileria has been fully refitted in 2022.
– Underwater painting
– Overhaul of main engine system
– Overhaul of Gen-Set
– 5 Years special survey preparation of Flag & Class Society requirements

M/Y STARBURST III -47 m

M/Y Starburst III has been fully refitted in 2023.
– Underwater painting system changed to Silicone AF system
– New piping system forsea water (CuNiFe)
– Overhaul of Main engine system
– Overhaul of 3 Gen/Set systems
– Overhaul of full pumps
– Changed all valves with classed type
– Replacement of new Insulations for exhaust pipe for M/E
– Overhaul hydraulic system
– Overhaul for all exterior tables
– Galley floor changed with new system
– Crew mess room upgrades
– Upgrades Ecdis system with new paperless system
– Changed all lids from seachests
– Maintained all hatches
– Grey Water tank sand blasted and painted
– 5 Years special survey preparation of Flag & Class Society requirements
– Loadline issues solved with new lightweight survey